Now all the floor is up, which means it is time to attck the plumbing. There is old galvanized metal pipes, pvc, and who know what else down there. So, we will take out the old and replace with proper new stuff. We are also changing the locations of sink pipes in the masterbath and refitting the sewer pipe. As well as putting some exposed pipes into the ground so they can't freeze (if we ever have winter weather). This part 1 is Matt in his lovely tyvek suit preparing to go under the house to begin the removal of the old stuff. Stay tuned for part 2 and 3 where old stuff is removed and new stuff gets in (respectively).
Hopefully next weekend(keep your fingers crossed for me).
No comments:
Post a Comment