Tuesday, April 27, 2010

Working on the second bathroom

Utilized the schluter system to waterproof the underlayment before we tile. Unfortunately, the cold winter put a serious slow down in tiling. This would have gone smoothly if we didn't have to change out the shower drain. But, we did and that required breaking out the concrete shower pan and retrofitting the proper drain. Luckily I had no part in that as well as not even having to listen to Matt complain about doing it...much. Good times people, good times.

No comments: